[Fwd: [sv-ec] Scheduling Semantics proposal]

From: Shalom Bresticker (Shalom.Bresticker@motorola.com)
Date: Tue Jan 14 2003 - 08:47:44 PST

  • Next message: Anders Nordstrom: "Re: errata/175: PROPOSAL - 13.2: file_path_spec syntax and related issues"

    --
    Shalom Bresticker                           Shalom.Bresticker@motorola.com
    Design & Reuse Methodology                             Tel: +972 9 9522268
    Motorola Semiconductor Israel, Ltd.                    Fax: +972 9 9522890
    POB 2208, Herzlia 46120, ISRAEL                       Cell: +972 50 441478
    

    "The devil is in the details."

    attached mail follows:


    I have just posted EXT-19 to the SV-EC website. This is the extension
    for the Scheduling Semantics that was passed to the SV-EC at the last
    in-person full committee meeting.
     
    Attached to this is the latest description of the proposal for the
    scheduling semantics from Phil Moorby (
    http://www.eda.org/sv-ec/sv-scheduling-5.html
    <http://www.eda.org/sv-ec/sv-scheduling-5.html> ).
     
    Please read through this and be prepared to discuss it at the meeting
    next week.
     
    Regards
    David
     
    David W. Smith
    Synopsys Scientist

    Synopsys, Inc.
    Synopsys Technology Park
    2025 NW Cornelius Pass Road
    Hillsboro, OR 97124

    Voice: 503.547.6467
    Main: 503.547.6000
    FAX: 503.547.6906
    Email: <mailto:david.smith@synopsys.com> david.smith@synopsys.com
     <http://www.synopsys.com/> http://www.synopsys.com



    This archive was generated by hypermail 2.1.4 : Tue Jan 14 2003 - 08:48:25 PST and
    sponsored by Boyd Technology, Inc.