issue promotion to vsgpassed

From: Shalom.Bresticker@motorola.com
Date: Wed Sep 24 2003 - 01:40:55 PDT

  • Next message: Shalom Bresticker: "Re: errata/469: 19.6: can `resetall occur within a module definition?"

    Precedence: bulk

    I have changed the status of the following issues to VSG-passed.
    These are issues which are already listed as ETF-passed and
    were passed by the VSG on Monday, September 22.

    265
    270
    275
    277
    309
    310
    322
    338
    346
    356

    Note that there are additional issues which should be promoted from
    ETF-Proposal to ETF-Passed or VSG-Passed.
    In some, the proposal was amended and needs to be updated.

    --
    Shalom Bresticker                           Shalom.Bresticker@motorola.com
    Design & Reuse Methodology                             Tel: +972 9 9522268
    Motorola Semiconductor Israel, Ltd.                    Fax: +972 9 9522890
    POB 2208, Herzlia 46120, ISRAEL                       Cell: +972 50 441478
    


    This archive was generated by hypermail 2.1.4 : Wed Sep 24 2003 - 00:54:14 PDT and
    sponsored by Boyd Technology, Inc.