errata/557: 9.3.2, para. 2: net "continuous assignment"

From: Shalom.Bresticker@motorola.com
Date: Mon Mar 08 2004 - 06:20:01 PST

  • Next message: Jason Woolf: "Amending the generate proposal"

    >Number: 557
    >Category: errata
    >Originator: Shalom.Bresticker@motorola.com
    >Description:

    9.3.2, para. 2, says,

    "A force statement to a variable shall override a procedural assignment or procedural continuous assignment that takes place on the variable until a release procedural statement is executed on the variable. After the release procedural statement is executed, the variable shall not immediately change value (as would a net that is assigned with a procedural continuous assignment)".

    The last sentence quoted talks about
    "a net that is assigned with a procedural continuous assignment".

    There is no such thing, assuming that the meaning is a procedural assign
    statement.

    It should probably be just "continuous assignment".

    -- 
    Shalom Bresticker                           Shalom.Bresticker@motorola.com
    Design & Reuse Methodology                             Tel: +972 9 9522268
    Motorola Semiconductor Israel, Ltd.                    Fax: +972 9 9522890
    POB 2208, Herzlia 46120, ISRAEL                       Cell: +972 50 441478
    

    [x]Motorola General Business Information [ ]Motorola Internal Use Only [ ]Motorola Confidential Proprietary



    This archive was generated by hypermail 2.1.4 : Mon Mar 08 2004 - 06:20:04 PST and
    sponsored by Boyd Technology, Inc.