errata/557: Re: errata/557: 9.3.2, para. 2: net "continuous assignment"

From: Steven Sharp (sharp@cadence.com)
Date: Mon Mar 08 2004 - 13:00:00 PST

  • Next message: Shalom.Bresticker@motorola.com: "Re: Fwd: Generate proposal again"

    The following reply was made to PR errata/557; it has been noted by GNATS.

    From: Steven Sharp <sharp@cadence.com>
    To: etf-bugs@boyd.com, Shalom.Bresticker@motorola.com
    Cc:
    Subject: Re: errata/557: 9.3.2, para. 2: net "continuous assignment"
    Date: Mon, 8 Mar 2004 16:15:48 -0500 (EST)

    >After the release procedural statement is executed, the variable shall not
    >immediately change value (as would a net that is assigned with a procedural
    >continuous assignment)".
    >
    >The last sentence quoted talks about
    >"a net that is assigned with a procedural continuous assignment".
    >
    >There is no such thing, assuming that the meaning is a procedural assign
    >statement.
     
     There _is_ such a thing, assuming that the meaning is a procedural force
     statement. Note that the sentence is talking about a release, which means
     it is ending a force. A deassign is used to end an assign. And when a
     force is released on a net, the net immediately changes value to what is
     being driven. So I don't see any problem here.
     
     Steven Sharp
     sharp@cadence.com
     



    This archive was generated by hypermail 2.1.4 : Mon Mar 08 2004 - 13:00:02 PST and
    sponsored by Boyd Technology, Inc.